Articles on: x.doc

How do I configure Overall Labor in X-doc?

Overview


The Overall Labor method in x.doc allows you to apply labor costs to the entire proposal instead of assigning labor to individual products.


  1. Navigate to the Rooms & Items page of your proposal editor page.



  1. Open the Labor Settings for the proposal where you want to apply labor.



  1. Select Overall as the Labor Type.
  2. Enter the required values for the labor headers. You can add custom labor headers, click the Add Header button to Add Header.
  3. Click Save and Close to apply the changes.



  1. Once you've added the labor, it will appear in the Pricing Breakdown section in the x.doc editor and Client PDF.



To change the labor settings, please refer to the steps outlined in the following knowledge base article: https://knowledgebase.xtenav.com/en-us/article/how-to-change-labor-type-to-overall-labor-1qh5slo/

Updated on: 07/10/2026

Was this article helpful?

Share your feedback

Cancel

Thank you!