Articles on: X-DRAW

How can I add cable length segments in XTEN-AV?

You can add cable length details by including an additional column in the Cable Schedule within the design in XTEN-AV.


Please navigate to the project, open the design, and hover over it. Then, click on the View Docs button to access and update the Cable Schedule.


Hover over the Automated Cable Schedule option, then click on the view icon to open it.



You will be redirected to the Cable Schedule page. Click on the Add Columns button located in the top-right corner of the page.



A pop-up will appear where you can enter the column name, enter as COLUMN LENGTH. You can also click on the Add New Column option to include additional columns as needed. Once done, click on the Save Changes button to save the details.



On the rightmost side of the page, you will find the newly added column. Click on the cell corresponding to the cable for which you want to enter the cable length, and then enter the details as needed.



Click on the Save button to save your changes. To export the cable schedule file, click on the .XLS or .PDF button to download the file in Excel or PDF format, respectively.





Updated on: 04/06/2026

Was this article helpful?

Share your feedback

Cancel

Thank you!