How to update the Status of product in X-pro project?
Overview
You can update the status of a product within an X-Pro project to track progress and manage project components more effectively.
- Navigate to the X-PRO dashboard from the left navigation menu.

- Open the required X-Pro project.

- Go to the Inventory section within the project.

- Locate and select the product whose status you want to update. Update the status as needed from the available options.

Updated on: 03/26/2026
Thank you!
